STAGE 4, September 26, 2019

 

STAGE 1- EXCAVATION & FOUNDATION

  • Making the big ol’ hole where your home will go

  • Concrete and Steel reinforcement is laid for the foundation


STAGE 3- ROUGH MEP

  • Mechanical, Electrical & Plumbing
    Systems


STAGE 5- INTERIOR FINISHES

  • Window sills, doors, trim, cabinets, appliances, vanities, and counter tops are installed

 

STAGE 2- FRAMING & STEEL REINFORCEMENT

  • Wooden bone structure of the home

  • Hides under the electrical and plumbing
    systems


STAGE 4- DRYWALL

  • On the outside of insulation to make less noise and give stability


STAGE 6- FINAL WALKTHROUGH

  • Builder will familiarize you with home features and a punchwalk will be performed

 

Building 1: Waiting for carpet- units are pretty much complete.

Building 2: Drywall has been installed, hardwood is being installed currently. The concrete for the front patios has been poured as well.

Building 3: Insulation placed throughout every unit. In the end unit, framing is being finished up.